Manufacturing & Inspection Process
Pump manufacturing equipment in the Zibo workshop

Manufacturing & inspection process

Inspection happens at the factory

Inspection records and order-specific checks help buyers see what was supplied and how it was reviewed. The inspection scope is matched to the confirmed pump, material and order requirements.

Discuss an inspection requirement

A clear sequence

From component checks to pump testing

Production and inspection records are tied to the agreed order scope, so buyers can review the product and the checks that apply to it.

01 · DEFINE

Confirm requirements

Align drawings, material grade, dimensions, test points and document needs.

02 · VERIFY

Check material and castings

Verify specified material; pressure-test pump casings and perform visual or penetrant checks as scoped.

03 · MACHINE

Measure components

Machine to applicable drawings and verify dimensions, including CMM checks where required.

04 · BALANCE

Prepare rotating parts

Dynamically balance impellers and check assembled-part fit against the order requirements.

05 · TEST

Review the finished pump

Complete-pump performance testing and witness points are arranged against the confirmed scope.

Inspection capabilities

Checks selected for the product and order

These in-house and external capabilities support the review. The quotation identifies which checks, reports and witness arrangements apply to a specific order.

Material

Material verification

Material is checked against the grade specified for the order; spectrometer or chemical analysis and supporting material records can be addressed in the agreed document scope.

Pressure boundary

Casing pressure testing

Pump casings receive pressure testing. Test medium, pressure, hold time and report format follow the applicable specification and confirmed order scope.

Surface and dimensions

Visual, penetrant and CMM checks

Visual inspection and liquid penetrant testing support surface review; coordinate measurement verifies dimensions against the applicable drawing.

Rotating parts

Dynamic balancing and fit

Impellers are dynamically balanced, and assembled parts are checked for fit against the applicable configuration.

External inspection

Additional methods by arrangement

Magnetic-particle and ultrasonic testing can be arranged through qualified third-party laboratories when specified.

Complete pump

Performance test on the factory bench

Complete-pump performance testing can be arranged on the factory test benches. Test curves are available by request; witness testing is arranged in advance.

3 benchesFactory performance-test benches
9,000 m³/hPublished maximum test capacity
6 barPublished maximum test pressure
250 kWPublished maximum driver power

Limits describe the factory’s stated test-bench capability. Confirm the applicable range and test conditions for the selected pump in the quotation.

Order evidence

Know what will be documented

Tell us what your quality team needs to review before the quotation is finalized.

Can we witness a test?

Witness testing can be arranged by agreement. State the requested test, acceptance criteria and preferred timing before the order scope is confirmed.

Can a third party inspect the order?

Third-party inspection can be arranged for the agreed scope. The inspection agency, checkpoints, notice period and cost responsibility should be confirmed in the quotation.

Are test curves and reports available?

Inspection records are maintained for orders. Test curves and specific reports are supplied when included in the confirmed document scope or requested and agreed for the order.

What should we provide?

Send the specification, drawing revision, material requirements, inspection plan and any customer or third-party witness requirements. The team will identify open points before quoting.

Need a specific test or document?

Share the order specification or inspection plan and we will confirm the applicable scope.