SULZER & AHLSTROM REPLACEMENT PROGRAM

Sulzer pump replacement.
Engineered to fit.

Replace your installed Sulzer or Ahlstrom pump without modifying existing piping or foundations. Get a matched complete pump, with the materials, testing and delivery documents your project specifies.

Only have a nameplate photo? Start here
COMPLETE PUMP REPLACEMENT01 / ENGINEERING
Blue industrial centrifugal pump with electric motor, orange coupling guard and baseplate
Hydraulic dutyInstallation fitMaterial specification
Complete-pump delivery
6–8 weeks
Engineering report / proposal
48 hours
Piping & foundation changes
Zero
Materials, testing & documents
Every pump

Delivery follows the agreed order schedule; the 48-hour review starts with sufficient pump and duty information. Fit is recorded against the exact installed configuration.

01 / IDENTIFY YOUR PUMP

Start with the installed series.

Choose a family for model-specific information. The full model and size on your nameplate identify the configuration we match.

AHLSTAR

A · APT · WPP/T · NPP/T · EPP/T

General process, wear-resistant, non-clogging and high-temperature configurations.

View family

ZA / ZE / ZF

Process & legacy pump configurations

ZE / ZF API 610 OH2 routes and model-specific ZA replacement.

View family

SNS

End-suction process pumps

Match duty, flange connections, centerline and mounting footprint.

View family

ZPP

Double-suction, axially split pumps

Review installed dimensions, driver arrangement and hydraulic duty.

View family

MC

High-pressure multistage pumps

Match stage count, duty, pressure and mechanical configuration.

View family

Series unknown or another Sulzer / Ahlstrom model? Send a nameplate photo for identification →

02 / ENGINEERING BASIS

A replacement that fits.
A fit you can review.

Four checks connect your installed pump to the proposed replacement. The proposal and approval drawings make the match clear before manufacture.

01

Hydraulic duty

Flow, head, speed, operating range and the system’s available NPSH.

Review against Duty data & pump curve
02

Installation fit

Flange sizes, nozzle orientation, centerline, mounting holes and baseplate interface.

Review against GA & interface dimensions
03

Mechanical arrangement

Rotation, coupling, driver, seal arrangement and maintenance access.

Review against Assembly & driver details
04

Fluid & materials

Temperature, corrosion, abrasion, viscosity, solids and specified wetted materials.

Review against Process & material specification
No piping or foundation modifications.

We match the installed interfaces and record the agreed dimensions in the project GA. Send installation photos and measurements if the original drawing is unavailable.

03 / CHOOSE THE RIGHT SCOPE

Repair, retrofit
or replace?

Compare the complete job: equipment, site work, downtime and the condition of the parts you plan to retain.

Compare my replacement options

Complete replacement pump

For an obsolete unit, repeated failures, a duplicate duty or an OEM schedule that misses your shutdown. Define the pump, driver, coupling, guard and baseplate scope in the quotation.

PRIMARY SUPPLY ROUTE

Bare pump or pump assembly

Retain a suitable driver or base arrangement. Check condition, alignment and interfaces before agreeing which equipment remains in service.

Wet end or selected components

For a serviceable retained assembly. A matched wet-end change can take two hours with prepared equipment and site access; isolation and commissioning are planned separately.

Need a part? Send the part number or BOM →

COMMERCIAL PLANNING

Put lead time and total scope side by side.

OEM comparison24–40 weeks
ANSI Pumps Pro6–8 weeks

Send the OEM quotation or scope for a like-for-like comparison. Include the same materials, tests, supplied equipment, shipping basis and required-on-site date.

04 / QUALITY & DELIVERY

Know what arrives
with your pump.

Each unit comes with the specified material, testing and delivery documents. Agree the document list and acceptance requirements with the order.

A

Approved configuration

GA and interface dimensions, selected duty, material and seal specification, and agreed supply boundaries.

B

Material & test records

Specified material identification and traceability, inspection records, and test reports to the agreed project scope.

C

Delivery & operation

Equipment identification, packing list, operating documentation and written warranty terms.

WARRANTY18 months from shipment12 months from commissioning

Whichever occurs first.
Terms are recorded in the supply agreement.

  1. 01 / SEND

    Your installed pump data

    Nameplate or full model, duty and available drawings. Photos are a useful starting point.

  2. 02 / REVIEW

    Report or proposal in 48 h

    From sufficient information. Review fit, configuration, outstanding data and supply scope.

  3. 03 / APPROVE

    Confirm the project basis

    Agree drawings, materials, tests, commercial terms and the delivery schedule.

  4. 04 / DELIVER

    Complete pump in 6–8 weeks

    Manufacture, agreed inspections and delivery documentation follow the order milestones.

NORTH AMERICAN PROJECTS

Make the quotation fit
your site and schedule.

Our factory is in Jinan, China. Include your US or Canadian destination and required-on-site date so the enquiry covers the complete supply route.

Site configuration

Send motor voltage and frequency, such as a 60 Hz supply, along with the flange standard and dimensional units used at your site. Include any project-specific electrical approval requirements.

Shipment & arrival

Distinguish the manufacturing schedule from transport, customs clearance and arrival at site. Request the delivery basis and confirmation of which freight, duty and unloading costs are included.

Acceptance & support

Identify the drawings, material records and acceptance tests your project requires. Ask for commissioning responsibilities, the warranty claim process and an engineering contact arrangement in the quotation.

Discuss GA drawings & test documentation

05 / START YOUR REPLACEMENT

Send the information you have.

A nameplate photo is enough to begin. Add duty data or drawings when available; our engineers will identify the next steps.

Start with your installed pump. Unknown technical details can be added later.

Prefer email? Send your nameplate to [email protected]Attach the files in your email application.

BEFORE YOU ENQUIRE

Common questions.
Clear answers.

About ANSI Pumps Pro
Will the replacement fit my existing piping and foundation?

Yes. Our replacement program matches the installed pump without piping or foundation modifications. The project GA drawing records nozzle sizes, orientation, centerline and mounting dimensions for approval against your exact model and installation.

Which Sulzer and Ahlstrom models do you cover?

Our program covers the models within the AHLSTAR A, APT, WPP/T, NPP/T and EPP/T, ZA / ZE / ZF, SNS, ZPP and MC families listed on this page. Send the full model and size from the nameplate so we can specify the correct configuration. For another series, send the nameplate for identification.

Can I start with only a nameplate photo?

Yes. Use the nameplate-photo route to send your email and the information you have. Model details, company information and files are optional to start. Our engineers identify the installed unit and explain which measurements or process data are needed next.

How do the 48-hour proposal and 6–8-week delivery work?

We provide an engineering report or proposal within 48 hours of receiving sufficient pump and duty information. Complete-pump delivery is 6–8 weeks against the agreed configuration and order schedule. Your quotation states the start date, approval milestones and delivery terms.

Can a wet-end change really take two hours?

A two-hour wet-end change is available for matched configurations with the replacement, tools and prepared installation ready on site. Isolation, draining, lifting arrangements, alignment and commissioning belong in the site shutdown plan. Confirm the applicable scope with our engineers.

What documentation and warranty come with the pump?

Each pump is supplied with the specified material, testing and delivery documents. Agree the GA drawing, material traceability, inspection and test records, operating documentation and packing list in the order. Warranty is 18 months from shipment or 12 months from commissioning, whichever occurs first, under the written supply terms.

Are you affiliated with Sulzer?

ANSI Pumps Pro is an independent aftermarket supplier. Sulzer, Ahlstrom and other third-party names identify installed equipment and replacement applications; ANSI Pumps Pro is not affiliated with or endorsed by Sulzer.

Quick Quote