AHLSTAR
General process, wear-resistant, non-clogging and high-temperature configurations.
SULZER & AHLSTROM REPLACEMENT PROGRAM
Replace your installed Sulzer or Ahlstrom pump without modifying existing piping or foundations. Get a matched complete pump, with the materials, testing and delivery documents your project specifies.
Only have a nameplate photo? Start here
Delivery follows the agreed order schedule; the 48-hour review starts with sufficient pump and duty information. Fit is recorded against the exact installed configuration.
01 / IDENTIFY YOUR PUMP
Choose a family for model-specific information. The full model and size on your nameplate identify the configuration we match.
General process, wear-resistant, non-clogging and high-temperature configurations.
ZE / ZF API 610 OH2 routes and model-specific ZA replacement.
Match duty, flange connections, centerline and mounting footprint.
Review installed dimensions, driver arrangement and hydraulic duty.
Match stage count, duty, pressure and mechanical configuration.
Series unknown or another Sulzer / Ahlstrom model? Send a nameplate photo for identification →
02 / ENGINEERING BASIS
Four checks connect your installed pump to the proposed replacement. The proposal and approval drawings make the match clear before manufacture.
Flow, head, speed, operating range and the system’s available NPSH.
Flange sizes, nozzle orientation, centerline, mounting holes and baseplate interface.
Rotation, coupling, driver, seal arrangement and maintenance access.
Temperature, corrosion, abrasion, viscosity, solids and specified wetted materials.
We match the installed interfaces and record the agreed dimensions in the project GA. Send installation photos and measurements if the original drawing is unavailable.
03 / CHOOSE THE RIGHT SCOPE
Compare the complete job: equipment, site work, downtime and the condition of the parts you plan to retain.
Compare my replacement optionsFor an obsolete unit, repeated failures, a duplicate duty or an OEM schedule that misses your shutdown. Define the pump, driver, coupling, guard and baseplate scope in the quotation.
PRIMARY SUPPLY ROUTERetain a suitable driver or base arrangement. Check condition, alignment and interfaces before agreeing which equipment remains in service.
For a serviceable retained assembly. A matched wet-end change can take two hours with prepared equipment and site access; isolation and commissioning are planned separately.
Need a part? Send the part number or BOM →COMMERCIAL PLANNING
Send the OEM quotation or scope for a like-for-like comparison. Include the same materials, tests, supplied equipment, shipping basis and required-on-site date.
04 / QUALITY & DELIVERY
Each unit comes with the specified material, testing and delivery documents. Agree the document list and acceptance requirements with the order.
GA and interface dimensions, selected duty, material and seal specification, and agreed supply boundaries.
Specified material identification and traceability, inspection records, and test reports to the agreed project scope.
Equipment identification, packing list, operating documentation and written warranty terms.
Whichever occurs first.
Terms are recorded in the supply agreement.
Nameplate or full model, duty and available drawings. Photos are a useful starting point.
From sufficient information. Review fit, configuration, outstanding data and supply scope.
Agree drawings, materials, tests, commercial terms and the delivery schedule.
Manufacture, agreed inspections and delivery documentation follow the order milestones.
NORTH AMERICAN PROJECTS
Our factory is in Jinan, China. Include your US or Canadian destination and required-on-site date so the enquiry covers the complete supply route.
Send motor voltage and frequency, such as a 60 Hz supply, along with the flange standard and dimensional units used at your site. Include any project-specific electrical approval requirements.
Distinguish the manufacturing schedule from transport, customs clearance and arrival at site. Request the delivery basis and confirmation of which freight, duty and unloading costs are included.
Identify the drawings, material records and acceptance tests your project requires. Ask for commissioning responsibilities, the warranty claim process and an engineering contact arrangement in the quotation.
05 / START YOUR REPLACEMENT
A nameplate photo is enough to begin. Add duty data or drawings when available; our engineers will identify the next steps.
Start with your installed pump. Unknown technical details can be added later.
Prefer email? Send your nameplate to [email protected]Attach the files in your email application.
Yes. Our replacement program matches the installed pump without piping or foundation modifications. The project GA drawing records nozzle sizes, orientation, centerline and mounting dimensions for approval against your exact model and installation.
Our program covers the models within the AHLSTAR A, APT, WPP/T, NPP/T and EPP/T, ZA / ZE / ZF, SNS, ZPP and MC families listed on this page. Send the full model and size from the nameplate so we can specify the correct configuration. For another series, send the nameplate for identification.
Yes. Use the nameplate-photo route to send your email and the information you have. Model details, company information and files are optional to start. Our engineers identify the installed unit and explain which measurements or process data are needed next.
We provide an engineering report or proposal within 48 hours of receiving sufficient pump and duty information. Complete-pump delivery is 6–8 weeks against the agreed configuration and order schedule. Your quotation states the start date, approval milestones and delivery terms.
A two-hour wet-end change is available for matched configurations with the replacement, tools and prepared installation ready on site. Isolation, draining, lifting arrangements, alignment and commissioning belong in the site shutdown plan. Confirm the applicable scope with our engineers.
Each pump is supplied with the specified material, testing and delivery documents. Agree the GA drawing, material traceability, inspection and test records, operating documentation and packing list in the order. Warranty is 18 months from shipment or 12 months from commissioning, whichever occurs first, under the written supply terms.
ANSI Pumps Pro is an independent aftermarket supplier. Sulzer, Ahlstrom and other third-party names identify installed equipment and replacement applications; ANSI Pumps Pro is not affiliated with or endorsed by Sulzer.