Installed SNS
Installed configurationEnd-suction, single-stage process pump
Information to sendFull model and size, speed, curve or original duty point.
SULZER & AHLSTROM REPLACEMENT PROGRAM
Replace your Sulzer SNS end-suction process pump without changing piping or foundations. Match the actual operating point, installation geometry, fluid and driver in one documented replacement proposal.
Only have a nameplate photo? Start here
Delivery follows the agreed order schedule; the 48-hour review starts with sufficient pump and duty information. The project GA records the exact installed interfaces.
01 / IDENTIFY THE CONFIGURATION
Use the nameplate to identify the installed unit, then distinguish the original selection from current operating conditions.
Installed configurationEnd-suction, single-stage process pump
Information to sendFull model and size, speed, curve or original duty point.
Installed configurationKeep the duty or accommodate a process change
Information to sendRequired flow and head, fluid, operating range and available NPSH.
Installed-family technical reference: Sulzer SNS range.
02 / ENGINEERING FIT
Retaining pipework is useful only when the replacement also suits the system. The selection connects operating conditions to the installation dimensions.
Required flow, head, speed and the operating range, including any process change from the existing duty.
Available NPSH, inlet conditions, fluid temperature and the selected pump’s required NPSH.
Flange size and orientation, centerline, mounting footprint, rotation and maintenance access.
Chemistry, viscosity, solids or fibers, wetted materials, seal arrangement and any retained motor.
Your report identifies the proposed configuration, agreed dimensions, supply boundaries and any data still required. Approval drawings establish the manufacturing basis.
03 / SCOPE & DOCUMENTS
Request a complete pump set, or a bare pump or assembly around a retained motor and base. Include driver power, speed, shaft and coupling details. For component supply, send the part number or assembly drawing and identify what remains in service.
Discuss my supply scopeDuty and interface drawings, material and seal specification, driver requirements and a clear equipment list.
Specified material identification and traceability, inspections and test reports to the agreed project requirements.
Equipment identification, packing list, operating documentation and the written delivery and warranty terms.
WARRANTY
18 months from shipment / 12 months from commissioningWhichever occurs first.
Recorded in the written supply terms.
Start with the model or nameplate, duty and available drawings.
From sufficient information, with the fit and supply scope recorded.
Confirm drawings, materials, inspections, tests and delivery milestones.
Manufacture and delivery follow the agreed order schedule.
04 / START YOUR REPLACEMENT
Send the information you have. Your series is preselected; unknown technical details can be added later.
Start with your installed pump. Unknown technical details can be added later.
Prefer email? Send your nameplate to [email protected]Attach the files in your email application.
Provide suction and discharge flange sizes and orientation, centerline height, nozzle positions, mounting holes and baseplate dimensions. The project GA records the installed interfaces and proposed replacement dimensions.
Yes. Identify the required flow, head, speed and operating range separately from the original duty. We select against the updated conditions and review suction conditions, motor power and installation requirements together.
Yes. Send the full model, available duty information, fluid details and operating readings. Photos and installation measurements help establish the replacement basis; the report identifies the remaining data needed for selection.
Include fluid composition, temperature, viscosity, solids concentration and particle or fiber characteristics. Add any corrosion, wear or seal history. These details help define wetted materials and the seal arrangement.
Provide the motor rating, speed, shaft, coupling and mounting information. We review power and mechanical compatibility against the replacement duty and record the retained-driver scope in the proposal.
We provide an engineering report or proposal within 48 hours of sufficient pump and duty information. Complete-pump delivery is 6–8 weeks against the agreed order schedule, with the specified material, testing and delivery documents.