Goulds 3196 STX Impeller Replacement — Materials, Trim & Fit Checks

Ordering a Goulds 3196 STX impeller requires more than identifying the frame. Confirm the installed pump size, impeller reference, trim diameter, material and mating wet-end configuration before release. This guide explains the information a repair shop or plant buyer should send for a dimensionally verified replacement review.

Goulds 3196 STX replacement impeller under dimensional inspection
Engineering source review Replacement-data workflow Updated Sep 23, 2026

01 · Identification

Identify the Exact 3196 STX Impeller First

A Goulds 3196 STX impeller should not be selected from the frame name alone. Match the replacement to the installed hydraulic size, existing impeller reference, finished trim diameter, material and mating wet-end configuration.

For current i-FRAME documentation, the small-frame designation is commonly shown as STi. Older installed equipment and maintenance records may use STX terminology. When generation matters to the component interface, confirm the actual installed configuration.

Pump size Frame family Component OEM reference to verify RFQ check
1 × 1.5 – 6 STX / STi Item 101 Impeller 076781 Reference + trim + material
1.5 × 3 – 6 STX / STi Item 101 Impeller 076792 Reference + trim + material
2 × 3 – 6 STX / STi Item 101 Impeller 0B10176 Reference + trim + material
1 × 1.5 – 8 STX / STi Item 101 Impeller 076793 Reference + trim + material
1.5 × 3 – 8 STX / STi Item 101 Impeller 076794 Reference + trim + material
Identification note: Do not classify the 2 × 3 – 8 hydraulic size as an STX/STi size. Published 3196 dimensional references place that size in the MTi/LTi group.

An OEM number is useful, but it should still be reviewed together with the pump size and installed component. A part number alone does not establish the finished impeller diameter, material or condition of an altered pump.

02 · Mechanical Fit

Threaded Impeller Fit: What Must Be Verified

A Goulds 3196 open impeller should not be described as a conventional cylindrical-bore impeller located by a shaft keyway. The impeller-to-shaft connection uses a threaded interface, and the replacement review must establish the actual shaft/impeller interface, sealing feature, axial relationship and hydraulic geometry.

Goulds 3196 STX replacement impeller showing trim diameter, threaded shaft interface and rear pump-out vane verification points
Check Why it matters Preferred evidence
Pump size Identifies the hydraulic family Nameplate / model record
Frame / generation Narrows mechanical configuration Frame marking / documentation
Impeller reference Cross-references the existing part Parts list / removed-part marking
Threaded shaft interface Confirms mechanical attachment Approved drawing / installed dimensions
Finished outside diameter Confirms hydraulic trim Curve / drawing / measured impeller
Rear pump-out vane geometry Affects hydraulic and axial behavior Existing part / approved geometry
Axial reference geometry Affects installed running position Drawing / mating wet-end dimensions
Engineering rule: Do not substitute a generic “bore-and-keyway” inspection for the actual 3196 impeller interface checks. Likewise, ASME B73.1 should not be used by itself as proof that an internal impeller is automatically interchangeable.
03 · Hydraulic Check

Impeller Trim Diameter Is Not the Same as Running Clearance

Two dimensions are commonly confused during replacement work. They should be reviewed separately before an impeller is released for manufacture.

Finished Trim Diameter

Controls the hydraulic performance associated with the impeller and applicable pump curve. Verify the current OD, operating speed, duty point and motor limitation.

Operating Clearance

Controls the running relationship between the open impeller and mating pump surfaces. Use the applicable IOM for the exact configuration and service temperature.

Do not assume the nominal “6-inch” or “8-inch” size suffix is the finished diameter to manufacture. A previously trimmed pump may use an impeller substantially different from the maximum diameter available for that hydraulic size.

Avoid copied clearances: Do not transfer a clearance from XLT-i, LF3196, CV3196 or another 3196 variant into an STX/STi repair simply because the pumps share the 3196 family name.
04 · Metallurgy

Material Selection: CF8M, CD4MCuN and Cast Ni-Cr-Mo Alloys

Material selection should start with the actual process service rather than the alloy name printed on an old quotation. Capture the liquid, concentration, operating temperature, contaminants, chlorides where relevant, solids and observed failure mode.

Material route Typical procurement description What must be confirmed
CF8M Cast austenitic stainless steel / 316-family reference Fluid chemistry, chlorides, temperature, solids and required casting specification
CD4MCuN Duplex stainless casting Exact grade, project specification, service chemistry and certification scope
Cast Ni-Cr-Mo alloy Often requested commercially as “Hastelloy C-276” service Exact casting grade, UNS designation, chemistry and project requirement
Cast-alloy caution: C-276 / UNS N10276 is a wrought alloy designation. For a cast impeller, the purchase specification should identify the actual required cast grade and UNS designation rather than assuming the wrought designation applies directly to the casting.

CF8M, duplex stainless and Ni-Cr-Mo alloys should not be reduced to a simple “good / better / best” ranking. If the existing impeller corroded, eroded or cracked, include photographs and process conditions so the failure mechanism can be reviewed before changing metallurgy.

05 · QA

Inspection and Documentation Before Shipment

Inspection requirements should be defined during quotation instead of being added as generic promises after an order is placed.

Verification Purpose
Part / drawing cross-reference Confirms the intended component
Finished impeller diameter Confirms the required trim
Thread and hub interface Confirms mechanical fit
Relevant axial dimensions Confirms installed relationship
Vane / pump-out vane geometry Confirms required hydraulic configuration
Runout Checks machining / rotating accuracy
Material traceability / MTR / PMI As specified in the agreed inspection scope
Balance acceptance As specified by PO or inspection plan

If a balance requirement is specified, state the applicable acceptance criterion on the purchase order or agreed inspection plan. Documentation scope should be agreed at quotation stage; do not assume every replacement impeller automatically includes every inspection document.

06 · RFQ Data

What to Send for an STX Impeller RFQ

The fastest path to a reliable replacement review is to send the installed evidence before the impeller is cast or machined.

STX Impeller Engineering Checklist

Copy these fields into your inquiry or use them as the minimum data set for a fit review.

Pump model / size3196 + exact hydraulic size
Frame / generationSTX / STi / installed marking
OEM impeller referenceInclude letters and leading zeros
Existing finished diameterInch or mm
Existing / required materialParts list, MTR or spec if available
Process liquidChemical / product name
Concentration & temperatureNormal + max where known
Observed damageCorrosion / erosion / rubbing / cracking
QuantityRequired number of impellers
DocumentationMTR / PMI / dimensional / balance if needed
Required dateRequested delivery date
EvidenceNameplate + removed-impeller photos
07 · FAQs

3196 STX Impeller Replacement FAQs

Is 2 × 3 – 8 a Goulds 3196 STX size?
Published 3196 dimensional references place 2 × 3 – 8 in the MTi/LTi group, not the STi small-frame group. The STi group includes 1 × 1.5 – 6, 1.5 × 3 – 6, 2 × 3 – 6, 1 × 1.5 – 8 and 1.5 × 3 – 8.
Can I order an STX impeller from the frame designation alone?
No. The frame narrows the configuration, but the exact pump size, impeller reference, finished diameter and material should also be confirmed.
Does a Goulds 3196 impeller use a shaft bore and keyway?
The standard open-impeller arrangement uses a threaded impeller-to-shaft interface rather than a conventional keyed cylindrical bore. Verify the exact interface against the installed shaft or approved engineering data.
Is impeller trim the same as impeller clearance?
No. Trim is the finished impeller outside diameter associated with hydraulic performance. Running clearance is the operating gap established during assembly and maintenance.
Can I specify “Hastelloy C-276” for a cast impeller?
Use caution. C-276 / UNS N10276 is a wrought alloy designation. A cast impeller should be purchased to the actual required casting grade and UNS designation.
Is PMI automatically included?
PMI should be specified in the quotation or inspection plan when required. The same applies to MTRs, dimensional reports and balance documentation.

Engineering Review

Send the pump model, operating duty and available process data before selecting or replacing wetted components.