Replace the casing. Preserve the rest of the pump. Compare a 4–8 week replacement delivery target and pricing 30–40% below a comparable OEM offer with an OEM planning reference of 16–24 weeks and $5,000–$15,000. ANSI Pumps Pro offers CD4MCuN and Hast C Alloy (ASTM A494 CW12MW); start with your installed Group, size and service conditions.
When a casing failure stops production
A corroded casing can put an otherwise serviceable Durco Mark III pump out of operation. Replacing the casing can preserve the investment in the power end, motor and installation when the retained components are sound and the replacement matches the installed configuration.
Compare purchase price, dispatch date and the cost of the outage together. A lower piece price has little value if it misses the shutdown window or requires unexpected work on the retained parts.
| Purchasing comparison | OEM reference | Compatible replacement target |
|---|---|---|
| Delivery | 16–24 weeks | 4–8 weeks |
| Budget | $5,000–$15,000 for an alloy casing | 30–40% below a comparable OEM offer |
| Scope to compare | Exact reference, material and documentation | Matched Group and size, cast grade, inspection and dispatch date |
Scroll to compare all columns
These are purchasing and budget references. The OEM lead-time range includes quotations compared by ANSI Pumps Pro; replacement targets and price comparisons are confirmed for the specified size, alloy, quantity, documentation and destination in the final quotation.
Working against a shutdown date? Send the nameplate, casing reference and required arrival date so we can review a stock or made-to-order supply route.
Match the alloy to the damage
The pattern of damage helps explain why a replacement in the same material may fail again. Review the fluid composition, concentration, temperature, solids and operating history before comparing alloys.
| What you see | What to investigate | What to compare |
|---|---|---|
| Broad wall thinning | General chemical attack, actual concentration and temperature, including cleaning conditions | CF8M, CN7M / Alloy 20 or a specified nickel-base casting against service-specific corrosion data |
| Localized pits or crevice attack | Chlorides and other contaminants, deposits, stagnant areas and temperature | CD4MCuN and specified nickel-base alternatives using the complete fluid conditions |
| Directional wear near high-velocity areas | Solids loading, particle size, velocity and combined erosion-corrosion | Material resistance together with the hydraulic duty and solids conditions |
Scroll to compare all columns
CD4MCuN and Hast C Alloy ASTM A494 CW12MW are available for quotation. Include the existing material, failed-part photos and fluid data so the proposal addresses both fit and the reason for replacement.
Durco Mark III: seven replacement checks
Confirm the casing and the parts that will remain in service against the applicable drawing. A casing, rear cover / seal chamber and power-end adapter have different interfaces; identify the supply scope before agreeing inspection dimensions.
| Check | Compare with the installed pump | Record for the proposal |
|---|---|---|
| 1. Group and full size | Mark III family, Group, complete size suffix and impeller arrangement | Nameplate, OEM reference or applicable parts drawing |
| 2. Suction and discharge flanges | Size, pressure rating, facing, drilling and orientation | Flange specification and mating pipe dimensions |
| 3. Installation dimensions | Nozzle centerlines and flange-face positions relative to the mounting datum | Applicable outline drawing and site measurements |
| 4. Casing support and mounting | Foot arrangement, bolt pattern and installation height where applicable | Mounting dimensions and support condition |
| 5. Casing-to-cover joint | Register, gasket surface, fasteners and the installed rear-cover arrangement | Drawing dimensions, fits and gasket requirements |
| 6. Impeller and rear-cover pairing | Retained hydraulic parts, trim, condition and configuration-specific clearance setting | Matched parts references and assembly requirements |
| 7. Auxiliary features | Drain / vent connections, optional ports and any special construction | Drawing notes and photographs of the existing features |
Scroll to compare all columns
Agree the critical dimensions and acceptance criteria in the quotation. Request a dimensional report, with CMM inspection of the specified features where required. This gives receiving and maintenance teams a common record to check before installation.

Cast grades, material codes and budget
A useful material comparison starts with the cast grade on the order. ANSI Pumps Pro supplies CD4MCuN and Hast C Alloy specified as ASTM A494 CW12MW. Identify the exact grade when comparing quotations for other alloys.
| Cast material | Specification reference | Relative budget | Purchasing consideration |
|---|---|---|---|
| CF8M / 316 family | ASTM A744 CF8M in the cited Mark 3 manual | 1.0× base | Use a comparable casing scope as the budget baseline. |
| CD4MCuN | ASTM A995 CD4MCuN | 1.5× | Available for quotation; review the fluid chemistry and erosion conditions. |
| CN7M / Alloy 20 | ASTM A744 CN7M in the cited manual | 2.5× | Compare against concentration- and temperature-specific corrosion data. |
| Hast C alloy family | Our confirmed cast option: ASTM A494 CW12MW | 4.5× | State the exact cast grade and compare the added investment with repeated replacement and outage costs. |
Scroll to compare all columns
The 1.5× / 2.5× / 4.5× indices are budget references supported by internal quotation records, with CF8M = 1.0× for comparable scopes. Size, casting weight, quantity and inspection scope change the final comparison.
CW12MW, CW6M and C-276 are distinct specifications. Keep the cast designation on the enquiry and order. The CW12MW data sheet identifies ASTM A494 and UNS N30002; a C-276 / UNS N10276 designation alone does not identify the CW12MW casting offered here.
Durco material code reference
The following relationships appear in figure 3-2 of the Flowserve Mark 3 manual, PCN 71569102, 03-17. Match the code to the document revision applicable to the installed pump.
| Durco code | Flowserve code | Material in the manual |
|---|---|---|
| DCI | E3020 | Ductile iron · ASTM A395 60-40-18 |
| D2 | C3062 | CF8 / 304 family · ASTM A744 |
| D4 | C3063 | CF8M / 316 family · ASTM A744 |
| CD4M | C3107 | Durcomet 100 / CD4MCuN · ASTM A995 |
| D20 | C4028 | Durimet 20 / CN7M / Alloy 20 · ASTM A744 |
| DC3 | K4008 | Chlorimet 3 / CW6M · ASTM A494 |
| Ti | H3004 | Cast titanium C3 · ASTM B367 |
Scroll to compare all columns
For another code, send the nameplate, drawing or previous purchase specification with the enquiry. Titanium should be specified by its applicable cast grade and reviewed for the service; it is not the final step in a universal material-upgrade ladder.
Certificates and pressure testing
EN 10204 3.1: Specify the required inspection certificate with the order. It records conformity with the order and specific inspection results, validated by the manufacturer’s authorized inspection representative independent of production. Link the certificate to the supplied grade, heat number and part identification.
Agree the document package before manufacture: material chemistry, mechanical results and heat-treatment records, together with dimensional inspection, PMI and other tests required by the purchase specification.
Hydrostatic test: 1.5× MAWP is a published ANSI-pump test reference. Apply the governing standard and approved procedure for the supplied casing, recording the MAWP basis, test pressure, hold duration, acceptance criteria and result. Include the agreed test report in the delivery documents.
Plan the replacement in six steps
- Identify the installed casing — Send the Group, complete size, serial number, casing / POS reference, material and quantity.
- Show the damage and service — Include photos, fluid composition, concentration, temperature, solids and the operating history.
- Compare the proposal — Review the cast grade, replacement scope, price, dispatch date and required arrival date together.
- Agree the evidence — Confirm drawings, critical dimensions, material traceability and inspection / pressure-test documents before manufacture.
- Inspect on arrival — Match the part identification, dimensions and documents to the purchase specification, then inspect the retained mating components.
- Install and commission — Follow the applicable Mark 3 and seal instructions, including alignment and configuration-specific impeller clearance settings.
Send the details once and request a proposal you can compare. Email the nameplate, photos, drawing or BOM, or open the Durco Mark III parts center.
Technical references
- Flowserve Mark 3 manual, PCN 71569102, 03-17 — figure 3-2, major components, inspection and assembly; manufacturer document archived by OTC Industrial.
- SF&E: CW12MW cast alloy data.
- Penflex: EN 10204 inspection certificates and type 3.1.
- PumpWorks PWA Gen 2 brochure, printed page 11 — published 1.5× MAWP hydrostatic-test example for ANSI pumps; use the applicable specification for the actual supply.
- TIMET: corrosion resistance of titanium — media- and condition-specific technical data.
