Hydraulic identity
Installed configurationFull MC model, size, stage count and speed
Information to sendNameplate, duty, existing curve and suction conditions.
SULZER & AHLSTROM REPLACEMENT PROGRAM
Replace your installed Sulzer MC stage-casing pump with a unit matched to its duty, pressure and mechanical arrangement. Review stage count, suction conditions, driver and installation interfaces before manufacture.
Only have a nameplate photo? Start here
Delivery follows the agreed order schedule; the 48-hour review starts with sufficient pump and duty information. The project GA records the exact installed interfaces.
01 / IDENTIFY THE CONFIGURATION
This page covers MC high-pressure multistage stage-casing pumps. The nameplate and assembly information identify the exact unit; MC and MCE are different families.
Installed configurationFull MC model, size, stage count and speed
Information to sendNameplate, duty, existing curve and suction conditions.
Installed configurationStage arrangement, driver and installation
Information to sendGA, assembly drawing, coupling and balance-device information.
Installed-family technical reference: Sulzer MC high-pressure stage-casing pump.
02 / ENGINEERING FIT
Total head alone does not define a multistage replacement. Pressure conditions, stage arrangement and mechanical loads belong in the same review.
Flow, head, speed, number of stages and the required operating range, including the first-stage suction requirement.
Operating and design pressures, fluid temperature and available NPSH. State whether readings are gauge or absolute.
Installed balance drum or disc arrangement, bearings, seals, absorbed power, driver rating and coupling.
Nozzle sizes, orientation, centerline, supports, mounting footprint and maintenance withdrawal space.
Your report identifies the proposed configuration, agreed dimensions, supply boundaries and any data still required. Approval drawings establish the manufacturing basis.
03 / SCOPE & DOCUMENTS
Specify a complete pump set or a bare pump around a retained driver and base. Include the existing coupling and assembly data. The proposal records the hydraulic selection, balance arrangement, driver requirements, mounting interfaces and supplied auxiliaries.
Discuss my supply scopeDuty and interface drawings, material and seal specification, driver requirements and a clear equipment list.
Specified material identification and traceability, inspections and test reports to the agreed project requirements.
Equipment identification, packing list, operating documentation and the written delivery and warranty terms.
WARRANTY
18 months from shipment / 12 months from commissioningWhichever occurs first.
Recorded in the written supply terms.
Start with the model or nameplate, duty and available drawings.
From sufficient information, with the fit and supply scope recorded.
Confirm drawings, materials, inspections, tests and delivery milestones.
Manufacture and delivery follow the agreed order schedule.
04 / START YOUR REPLACEMENT
Send the information you have. Your series is preselected; unknown technical details can be added later.
Send your email and the information you have. Model, company and files are optional to start.
Prefer email? Send your nameplate to [email protected]Attach the files in your email application.
This page covers MC high-pressure multistage stage-casing pumps. MCE is a different family. Send the full model or a nameplate photo if the installed designation is unclear.
Yes. Send the complete model, nameplate, available drawings and overall pump photos. We identify the stage arrangement from the available records and explain what else is needed for selection.
Differential head defines the hydraulic duty, while inlet and discharge pressures help define the pressure boundary and operating conditions. Include maximum and normal values and state whether pressure readings are gauge or absolute.
The balance arrangement, bearings, seals, shaft line and driver form a connected mechanical system. Assembly drawings and driver data help define the replacement’s axial-load management, power and coupling requirements.
We match installed piping and foundation interfaces and record them in the approval GA. Retained driver and base equipment also need their ratings, dimensions, alignment interfaces and condition reviewed against the replacement configuration.
Review the duty, stage and pressure basis, approval drawings, materials, inspection and test plan, and supply boundaries. We provide a report or proposal within 48 hours of sufficient information; complete-pump delivery is 6–8 weeks against the agreed order schedule.