Skip to replacement information

SULZER & AHLSTROM REPLACEMENT PROGRAM

ZPP split-case
replacement pumps.

Replace an installed Sulzer ZPP double-suction, axially split pump. Match the duty, casing interfaces, rotation and driver arrangement, with a clear scope for complete-pump or component supply.

Only have a nameplate photo? Start here
ZPP / REPLACEMENT ENGINEERINGINSTALLATION MATCH
Engineering illustration of a ZPP split-case replacement pump and motor
Engineering illustration. Your supplied configuration follows the approved project drawings.
Hydraulic dutyInstallation fitDocumented supply
Complete-pump delivery
6–8 weeks
Engineering report / proposal
48 hours
Piping & foundation changes
Zero
Materials, testing & documents
Every pump

Delivery follows the agreed order schedule; the 48-hour review starts with sufficient pump and duty information. The project GA records the exact installed interfaces.

01 / IDENTIFY THE CONFIGURATION

Identify the pump and what stays.

ZPP is a double-suction, axially split, single-stage configuration. The exact model, size and assembly data establish the replacement route.

Pump identity

Installed configurationFull installed model, size and serial number

Information to sendNameplate, duty, GA and rotation shown with the viewing direction.

Retained equipment

Installed configurationDriver, base or selected pump components

Information to sendIdentify what stays and provide its dimensions, drawings and condition.

Installed-family technical reference: Sulzer ZPP range.

02 / ENGINEERING FIT

Check the casing,
shaft line and duty.

The supply boundary determines which interfaces must match. A complete replacement and a component replacement need different approval information.

01

Double-suction duty

Flow, head, speed, suction pressure, fluid properties and available NPSH for the installation.

Recorded inHydraulic selection basis
02

Casing & mounting

Nozzle sizes and orientation, split-case geometry, centerline, mounting footprint and service access.

Recorded inGA & casing interfaces
03

Rotation & driver

Rotation with its viewing direction, shaft and coupling dimensions, driver rating and arrangement.

Recorded inShaft-line & driver details
04

Retained assembly

Part numbers, BOM, assembly drawings and mating dimensions for any components that remain.

Recorded inComponent scope & interface record
Review the match before manufacture.

Your report identifies the proposed configuration, agreed dimensions, supply boundaries and any data still required. Approval drawings establish the manufacturing basis.

03 / SCOPE & DOCUMENTS

Two routes. One clear supply scope.

Choose the route that matches the condition of your installed equipment. Record supplied and retained items in the quotation and approval drawings.

Complete pump or bare pump

For an obsolete unit, a duplicate duty or a wider replacement. Define the driver, coupling, guard and baseplate scope.

Request pump replacement

Selected components

For a serviceable retained assembly. Send part numbers, BOM or assembly drawings and describe the mating interfaces.

Request a component review

Approved configuration

Duty and interface drawings, material and seal specification, driver requirements and a clear equipment list.

Material & test records

Specified material identification and traceability, inspections and test reports to the agreed project requirements.

Delivery & operation

Equipment identification, packing list, operating documentation and the written delivery and warranty terms.

WARRANTY

18 months from shipment / 12 months from commissioning

Whichever occurs first.
Recorded in the written supply terms.

  1. 01 / SEND

    Your installed pump data

    Start with the model or nameplate, duty and available drawings.

  2. 02 / REVIEW

    Report or proposal in 48 h

    From sufficient information, with the fit and supply scope recorded.

  3. 03 / APPROVE

    Agree the project basis

    Confirm drawings, materials, inspections, tests and delivery milestones.

  4. 04 / DELIVER

    Complete pump in 6–8 weeks

    Manufacture and delivery follow the agreed order schedule.

04 / START YOUR REPLACEMENT

Let’s review your ZPP pump.

Send the information you have. Your series is preselected; unknown technical details can be added later.

Send your email and the information you have. Model, company and files are optional to start.

Drop files here or
Accepted file types: pdf, jpg, jpeg, png, doc, docx, xls, xlsx, Max. file size: 50 MB, Max. files: 10.
    Attach what you have. You can also email files after your request.
    Include destination, required-on-site date, supply scope or any duty information you know.
    This field is for validation purposes and should be left unchanged.

    By submitting this form, you acknowledge that the information provided will be used to respond to your inquiry and provide related technical or commercial support. See our Privacy Policy.

    Prefer email? Send your nameplate to [email protected]Attach the files in your email application.

    BEFORE YOU ENQUIRE

    ZPP replacement.
    Clear answers.

    View the replacement program
    Can I replace components while retaining the casing or assembly?

    Send the exact model, part numbers or BOM, assembly drawings and the dimensions of mating components. The component proposal identifies what is supplied and the interfaces with the equipment you retain.

    How should I describe pump rotation?

    State clockwise or counterclockwise together with the viewing direction, and mark it on a photo or drawing. A direction without a viewing reference can be ambiguous.

    Do you supply a complete pump or a bare pump?

    Both routes can be reviewed. Define whether the motor, coupling, guard and baseplate are supplied or retained. Include the driver and installation information for the chosen boundary.

    What if I do not have a component part number?

    Start with the nameplate, clear component photos, assembly drawings and available measurements. We identify the additional details needed to define the component and its mating interfaces.

    What matters when retaining part of a split-case assembly?

    The review includes split-joint geometry, fit and alignment interfaces, shaft and rotating-element details, sealing and the condition of retained parts. Provide the assembly information and identify the proposed supply boundary.

    What records define the agreed replacement?

    The proposal and approval drawings record duty, dimensions, materials, supplied equipment and retained interfaces. The order also defines inspections, test records, operating documents, delivery milestones and written warranty terms.

    Quick Quote