How to Read a Pump P&ID: Pump Symbols, Tags, Valves & Minimum Flow

How to Read a Pump P&ID: Pump Symbols, Tags, Valves & Minimum Flow

Follow the flow path, identify the installed pump, and turn the drawing into a useful replacement brief.

Already have a drawing?
Prepare your pump review ↗
  1. P&ID
  2. Identify pump
  3. Extract duty & interfaces
  4. Existing pump replacement
  5. RFQ
A process pump, one drawingP-101A / simplified example
Original simplified centrifugal pump P&IDTank TK-101 supplies pump P-101A through an isolation valve and strainer. Pump discharge passes pressure and total-flow measurement before splitting into a controlled recycle return to the tank and a main line with a check valve and isolation valve. FT-202 signals FIC-202, which controls recycle valve FV-202. The diagram is a teaching example, not a construction drawing. TK-101Source tank HV-101ST-101PI201Suction line MMotorP-101ACentrifugal pump NRV-101HV-102To process headerMain process flow PI203FT202FIC202Flow signal / recycle controlTotal pump flow FV-202Recycle branches beforethe main-line check valve.Minimum-flow return to TK-101 1 2 3 4 5 6
1

The legend comes first.

Confirm the symbols, line conventions and revision before interpreting a drawing. TK-101 is the source tank in this example; these identifiers are defined by the project.

Read the full guide ↓

Original, simplified teaching example. Not to scale. Not a construction or operating drawing. Seal support, drains and other auxiliary systems are omitted. On mobile, scroll the drawing to read the labels.

Start with the system, then the pump.

A piping and instrumentation diagram shows equipment, connected piping, valves, instruments and control relationships. Read a pump P&ID by confirming the legend, locating the pump tag, tracing the suction and discharge paths, and identifying the protection and control arrangements.

Use the drawing to organize what you know about the installed system. Then pair it with the pump datasheet, nameplate, performance curve and dimensional drawing to prepare a replacement review.

What you can usually trace

  • Equipment identity and process connections
  • Flow direction and cross-sheet references
  • Isolation, non-return and control functions
  • Measurement points and auxiliary connections

What needs other documents

  • Confirmed model, size and impeller diameter
  • Actual operating flow, head and speed
  • Available NPSH and liquid properties
  • Flanges, mounting dimensions and fitment

Match each question to the right drawing.

Start with the drawing number, revision, issue status, legend and referenced sheets. Record whether the document is issued for design, construction or as-built use, and reconcile approved changes with the installed system. A line leaving the sheet needs a destination drawing and connection reference.

Documents used together in a pump review
DocumentQuestion it answersData to cross-check
PFD — process flow diagramWhere does the pump fit in the process?Major equipment, streams and stated process conditions.
P&ID — piping and instrumentation diagramWhat is connected, measured, isolated and controlled?Equipment tags, line IDs, valve functions, utilities and cross-sheet references.
Pump datasheet and performance curveCan this pump deliver the required duty?Flow range, head, speed, impeller, power, NPSH and operating limits.
GA, layout and piping isometricsWill the replacement fit the installation?Nozzle position, elevations, flanges, baseplate, anchors, routing and supports.
Control narrative and cause-and-effect matrixWhat initiates an alarm, permissive or trip?Inputs, outputs, voting where specified, delays, reset and restart conditions.
Seal/vendor P&ID and utility dataHow are the seal and auxiliary systems supported?Connection labels, circulation, fluid, pressure, cooling and monitoring requirements.

Keep the same equipment tag across the review package. A pump drawn close to a vessel has a schematic relationship; the layout and isometric establish physical distances and elevations. For the piping interfaces, use the pump nozzle load review.

Recognize the symbol. Confirm the identity.

Common symbols help you find a pump quickly, but the project legend owns their meaning. A centrifugal pump symbol alone does not identify the manufacturer, model, material, impeller or replacement dimensions.

Centrifugal pumpUse the connections and tag to confirm the flow path.
M
Motor-driven pumpConfirm speed and electrical data from the driver documents.
M
Vertical sump pumpSetting, shaft and support geometry need a dimensional drawing.

Original illustrative symbols. Confirm the forms used in your project before interpreting a real drawing.

Equipment tag exampleP-2101A
PPump, under this project’s convention2101Project equipment identifierASuffix distinguishing this unit

A pump tag is a reference, not a model.

Use it to locate the equipment list, datasheet and related drawings. The number may encode an area, system or sequence; check the project rules before decoding it.

A/B suffixes may distinguish related units. They do not, by themselves, establish duty/standby operation. Confirm the arrangement in the drawing notes or control documents.

Equipment and instruments use different identifiers. P-2101A identifies equipment here. PI-201 identifies a pressure indication function; it is not another pump.

For a vertical sump installation, collect the drawing-defined setting and interfaces using the 3171 replacement data checklist. A generic vertical symbol does not establish a 3171 model.

Trace both sides of the pump.

Follow the piping connections and flow arrows. The suction side is not always on the left of the page, and the discharge side is not always on the right. Follow off-page references to complete the system picture.

3

From the source to the suction nozzle

In the example, TK-101 feeds HV-101, ST-101 and pump P-101A. PI-201 is a suction-side pressure indication point.

  • Identify the source vessel, header and relevant liquid levels.
  • Record isolation and strainer arrangements where shown.
  • Find pressure taps and cross-sheet connections.
  • Use dimensions, levels and loss data to review suction conditions.
Review the NPSH data you need
4

From the discharge nozzle to the process

The example shows PI-203, total-flow measurement, a recycle branch, NRV-101 and HV-102 before the process header.

  • Confirm the check valve’s permitted direction.
  • Locate isolation and control functions.
  • Identify where measured flow splits into process and recycle flow.
  • Trace the downstream destination and auxiliary branches.
Connect the duty to a pump curve

Identify the valve function before its exact type.

Tag in this exampleFunctionWhat the drawing does not establish
HV-101 / HV-102Manually operated isolationThe generic symbol does not establish ball, gate or globe construction, pressure rating or normal position.
NRV-101Non-return / check valveConfirm the allowed direction and actual valve type. A check valve is not a positive isolation device.
FV-202Controlled recycle valveConfirm actuator, fail position, valve capacity and control action from the valve and control documents.
ST-101Strainer in this project’s legendConfirm element specification and clean/dirty pressure loss. A strainer is not a valve.

Line identifiers may include pipe size, service, sequence and piping class. Read each field against the project’s line-numbering rules and line list; the code is not universal. Normal-open/normal-closed notes describe a stated condition, while fail-open/fail-closed notes describe a specified failure response.

Read the instrument letters in context.

Tag in this exampleMeaningWhat to confirm
PI-201 / PI-203Pressure indicatorTap location, pressure basis and actual reading
FT-202Flow transmitterIt measures total pump flow before the split here.
FIC-202Flow indicating controllerControl action and setpoint in the control documents
FV-202Flow control valveRecycle service, sizing and actual valve specification

For these instrument tags, the first letter identifies the measured variable and succeeding letters identify functions. A control signal line is not a fluid pipe. Alarm or switch symbols alone do not describe the complete shutdown logic.

Separate valve state, control, alarm and shutdown.

Read the condition attached to each valve state.

Valve-state notes: typical meanings to confirm in the project legend
MarkingCondition describedReview question
NO / NCNormally open / normally closed in the stated operating condition.Which mode is normal: running, standby or shutdown?
FO / FC / FISFail open / fail closed / fail in situ (hold position), for the defined failure.Is the failure loss of air, electrical power, control signal or a combination?
LO / LCLocked open / locked closed.Which approved isolation and operating procedure governs the lock?
CSO / CSCCar-sealed open / car-sealed closed.What seal-control procedure applies, and how is position verified?

A valve can be normally open and fail closed: the labels describe different conditions. Confirm the actuator, solenoid and energy sources with the valve datasheet and control documents. Selection of the required failure response belongs to the process hazard and control review.

Follow the complete functional chain.

In the original diagram above, FT-202 → FIC-202 → FV-202 describes measurement, control and the final element for recycle. A normal regulating loop can change valve position continuously. An alarm calls for an operator response; a trip commands the action defined in the cause-and-effect matrix.

Control functions to document
FunctionRecord from the approved package
Normal controlMeasured variable, tap location, signal type, controller action, setpoint and final element.
AlarmInitiating tag, threshold, units, delay/deadband where specified and required operator response.
Permissive or tripInitiating condition, logic reference, commanded equipment action, valve response, latching/reset and restart requirements.

For a low-suction-pressure trip, for example, identify the actual pressure device, logic and motor-stop output in the approved documents. Include any associated valve commands. A switch symbol alone does not establish the complete shutdown sequence or a SIL rating. Field checks and functional testing follow the approved plant procedure.

Find the minimum-flow path.

A centrifugal pump may need recycle flow when the process demand falls below its permitted operating flow. Trace the branch from the discharge side to its destination, then identify how its flow is limited or controlled.

Flow balance at the process/recycle split

\[ \begin{aligned} Q_{\mathrm{pump}}&=Q_{\mathrm{process}}+Q_{\mathrm{recycle}}\\ &=20+10=30\;\mathrm{m^3/h} \end{aligned} \]

Q identifies volumetric flow. This simplified steady-state example assumes a constant-density liquid and no other branches or accumulation. FT-202 is before the split and measures total pump flow. The values illustrate the balance; the approved minimum-flow requirement comes from the pump manufacturer.

Continuous bypass

A return path remains available through a restriction. Actual recycle flow depends on pressure difference and the restriction characteristics.

Look for: branch + restriction + destination

Controlled recycle

A measurement and control loop adjusts the return valve. In a total-flow control arrangement like this example, the recycle valve opens further as measured pump flow falls below the control target. Confirm the measurement location, setpoint and control action for the actual system.

Look for: flow measurement + loop + valve

Automatic recirculation valve

A self-operated device can combine a main-line non-return function with controlled bypass flow. Confirm the actual manufacturer’s arrangement.

Look for: device tag + main outlet + bypass

Do not confuse recycle with seal flush.

A pipe leaving the discharge is not automatically a minimum-flow line. For example, API Plan 11 routes discharge liquid through an orifice to the seal chamber for cooling and lubrication. Other small lines may be vents, drains, cooling services or relief connections. Trace both endpoints and check the vendor drawings.

The return to TK-101 is one teaching arrangement. Its sizing, heat rejection and pressure losses need application review; a short discharge-to-suction loop is not a universal solution.

Review the seal, utilities, vents and drains.

Trace every auxiliary line to both endpoints and record the interface owner. A complete replacement review includes the seal chamber and support system as well as the main suction and discharge nozzles.

Auxiliary-system review checklist
Circuit or connectionWhat to recordSupporting document
Process-side seal flushSource and destination, restriction, filter/cooler if fitted, direction and required conditions.Seal drawing, connection schedule and specified piping plan.
Dual-seal buffer/barrier circuitFluid, reservoir, pressure relationship, circulation method, level/pressure/temperature monitoring.Seal and support-system datasheets and vendor P&ID.
Cooling water or other cooling utilitySupply/return, available pressure and temperature, required flow and heat-removal duty.Utility schedule and cooler data.
Bearing lubricationOil or grease arrangement, supply/return if applicable, cooler and monitoring.Pump IOM and lubrication documentation.
Vent, drain and collectionDestination, pressure boundary, closed/open drain identification and isolation points.P&ID, line list and approved maintenance/isolation procedure.

A reservoir and cooler are clues to a support system; confirm the API plan and seal arrangement from the vendor package. John Crane’s reservoir-system information illustrates why circulation and cooling configurations must be checked against the selected system. For line opening or maintenance, establish isolation, depressurization and drainage through the approved site procedure.

Keep differential pressure separate from design pressure.

Differential pressure describes the pressure rise between specified suction and discharge reference points. Design pressure is part of the specified pressure boundary. Record operating pressure, differential pressure, design pressure and test pressure in separate fields, with gauge or absolute basis where relevant.

For a steady, incompressible liquid, pump total head between suction and discharge nozzle reference sections includes pressure, velocity and elevation terms:

Pump total head between nozzle reference sections

\[ \begin{aligned} H&=\frac{p_d-p_s}{\rho g}\\ &\quad+\frac{v_d^2-v_s^2}{2g}+(z_d-z_s) \end{aligned} \]

H is head in m; p is static pressure in Pa on a consistent reference basis; ρ is liquid density in kg/m³ at the stated condition; g is gravitational acceleration in m/s²; v is mean velocity in m/s; z is elevation in m. Subscripts d and s identify discharge and suction reference sections. Remote pressure taps require correction for intervening losses and elevations.

Worked example with explicit liquid density

Use a fictional liquid with density 900 kg/m³ and a nozzle differential pressure of 2.5 bar. Assume negligible velocity-head and elevation differences between the reference sections.

Pressure-to-head conversion for this example

\[ \begin{aligned} H&\approx\frac{\Delta p}{\rho g}\\ &=\frac{250000}{900\times9.81}\\ &\approx28.3\;\mathrm{m} \end{aligned} \]

Δp is 250,000 Pa, converted from 2.5 bar; ρ is 900 kg/m³; g is 9.81 m/s². The result is metres of the stated liquid. This is an original calculation example, not a duty or rating for the pump in the diagram.

Use the full head expression when velocity or elevation terms matter. Actual duty also needs flow, speed, liquid conditions and the pump curve. KSB’s head reference explains the energy basis of pump head.

Turn the drawing into a replacement brief.

Record what the drawing establishes and what still needs confirmation. Keep design pressure separate from operating pressure or pump differential head. Pipe size alone does not establish flow, and a matching flow/head point does not establish physical interchangeability.

Information to collectStart with the P&IDConfirm with
Pump identityTag, service and equipment notesNameplate, equipment list, datasheet
Operating dutyAny stated flow or pressure dataNormal/minimum/maximum flow, head, curve and field data
Liquid conditionsService and line identificationFluid, concentration, temperature, density, viscosity and solids
Suction conditionsSource, piping and measurement pointsLevels, elevations, absolute pressure, losses and NPSHA
Minimum-flow protectionBranch, return destination and controlsPump limits, valve data and control description
Installed interfacesNozzle and connection cluesGA, flange details, nozzle orientation and mounting dimensions
Wetted materials and sealsAny material or seal notesCasing/impeller materials, elastomers, seal faces, seal arrangement and liquid compatibility
Driver and sealingDriver symbols and auxiliary systemsMotor nameplate, speed, seal datasheet and vendor drawing
Supply scopeWhich equipment is being replacedComplete pump or bare pump; items included or reused

Use the pump curve reading guide to interpret hydraulic data, the frame and fitment guide for installed configuration, and the chemical resistance guide for preliminary material review.

Close the drawing review before replacement or startup.

Use one review register with columns for finding, document/revision, equipment or line tag, owner and closeout evidence. Mark a missing value as “to be confirmed” and assign it to the responsible discipline.

  1. Document identity: equipment tag, current revision, issue status, project legend and cross-sheet destinations agree.
  2. Main route: source, isolation, strainer, pump, check valve, discharge destination and parallel-pump connections are identified.
  3. Line specification: nominal size, applicable dimension standard, wall thickness, material, piping class, flange facing and rating are checked against the line list and specification.
  4. Protection and control: measurement location, recycle capacity and return destination, failure responses and logic references are documented.
  5. Auxiliaries: seal, cooling, lubrication, vents and drains have defined interfaces and service conditions.
  6. Duty and fit: datasheet, curve, GA, materials, seal chamber, driver and supply scope agree with the replacement request.
  7. Release: open items are resolved or formally dispositioned by the responsible discipline before the relevant procurement, installation or startup release.

Nominal pipe size is a designation. Check actual outside diameter, wall thickness and resulting bore against the applicable dimension table; a schedule number alone is insufficient to determine allowable working pressure. The ASME B36.10M overview describes the dimensional scope.

Carry the closed review items into the RFQ and commissioning checklist, including the approved startup checks for the selected pump and system.

Have a P&ID or a pump tag?
Start with what you have.

You do not need to know the exact replacement model. Send the pump tag, P&ID, nameplate or datasheet and the known duty information.

Choose your replacement scope

Copy the brief into the RFQ’s Material / Seal / Notes field. Download a TXT copy for your records, and upload your P&ID, nameplate or datasheet in the RFQ. PDF and photo files are accepted, up to 10 MB per file. This worksheet keeps your information on your device until you submit the RFQ.

Request a Replacement Pump Review

Open the engineering RFQ, paste your brief into Material / Seal / Notes, and upload the available equipment documents. Missing details can be identified during review.

Continue to pump RFQ ↗
Already know the installed family? Goulds 3196 reviewDurco Mark III review

Pump P&ID review: common questions

Can a pump tag alone identify the replacement model?

A tag such as P-2101A identifies equipment under the project’s rules. Use it to locate the nameplate, equipment list and datasheet. Final replacement selection also needs duty, materials, seal arrangement and dimensional interfaces.

Does NO mean the valve fails open?

NO describes a normally open valve in the stated operating condition. FO describes the required open position under a specified failure. Confirm the failure case and actuator response in the valve and control documents.

Does a P&ID show the complete pump shutdown logic?

The P&ID identifies relevant instruments and control connections. The control narrative, cause-and-effect matrix and logic documents define initiating conditions, delays, outputs, reset and restart requirements.

Can design pressure be used to calculate pump head?

Use the pressure difference between defined suction and discharge reference points, liquid density, velocity and elevation terms to determine pump head. Design pressure is a separate pressure-boundary parameter.

Is every discharge branch a minimum-flow line?

Trace the destination and function of the branch. Minimum-flow recycle, seal flush, cooling, venting and drainage serve different purposes. Confirm the recycle requirement with the selected pump’s manufacturer data and control package.

Can a reservoir and cooler identify an API seal plan?

Confirm the seal arrangement and piping plan in the seal vendor’s datasheet and P&ID. Reservoirs and coolers can be used in different support-system configurations, with different pressure and circulation requirements.

Technical sources

This guide uses original illustrations and a fictional system example. Read it alongside your project’s legend, applicable specifications and equipment documents.