How to Read a Pump P&ID: Pump Symbols, Tags, Valves & Minimum Flow
Follow the flow path, identify the installed pump, and turn the drawing into a useful replacement brief.
Prepare your pump review ↗
- P&ID
- Identify pump
- Extract duty & interfaces
- Existing pump replacement
- RFQ
Colours distinguish paths for this guide. Actual drawings may use different conventions. Solid gray shaft line: mechanical connection to the motor. HV: isolation valve; ST: strainer; NRV: check valve; FV: flow control valve.
The legend comes first.
Confirm the symbols, line conventions and revision before interpreting a drawing. TK-101 is the source tank in this example; these identifiers are defined by the project.
Original, simplified teaching example. Not to scale. Not a construction or operating drawing. Seal support, drains and other auxiliary systems are omitted. On mobile, scroll the drawing to read the labels.
Start with the system, then the pump.
A piping and instrumentation diagram shows equipment, connected piping, valves, instruments and control relationships. Read a pump P&ID by confirming the legend, locating the pump tag, tracing the suction and discharge paths, and identifying the protection and control arrangements.
Use the drawing to organize what you know about the installed system. Then pair it with the pump datasheet, nameplate, performance curve and dimensional drawing to prepare a replacement review.
What you can usually trace
- Equipment identity and process connections
- Flow direction and cross-sheet references
- Isolation, non-return and control functions
- Measurement points and auxiliary connections
What needs other documents
- Confirmed model, size and impeller diameter
- Actual operating flow, head and speed
- Available NPSH and liquid properties
- Flanges, mounting dimensions and fitment
Match each question to the right drawing.
Start with the drawing number, revision, issue status, legend and referenced sheets. Record whether the document is issued for design, construction or as-built use, and reconcile approved changes with the installed system. A line leaving the sheet needs a destination drawing and connection reference.
| Document | Question it answers | Data to cross-check |
|---|---|---|
| PFD — process flow diagram | Where does the pump fit in the process? | Major equipment, streams and stated process conditions. |
| P&ID — piping and instrumentation diagram | What is connected, measured, isolated and controlled? | Equipment tags, line IDs, valve functions, utilities and cross-sheet references. |
| Pump datasheet and performance curve | Can this pump deliver the required duty? | Flow range, head, speed, impeller, power, NPSH and operating limits. |
| GA, layout and piping isometrics | Will the replacement fit the installation? | Nozzle position, elevations, flanges, baseplate, anchors, routing and supports. |
| Control narrative and cause-and-effect matrix | What initiates an alarm, permissive or trip? | Inputs, outputs, voting where specified, delays, reset and restart conditions. |
| Seal/vendor P&ID and utility data | How are the seal and auxiliary systems supported? | Connection labels, circulation, fluid, pressure, cooling and monitoring requirements. |
Keep the same equipment tag across the review package. A pump drawn close to a vessel has a schematic relationship; the layout and isometric establish physical distances and elevations. For the piping interfaces, use the pump nozzle load review.
Recognize the symbol. Confirm the identity.
Common symbols help you find a pump quickly, but the project legend owns their meaning. A centrifugal pump symbol alone does not identify the manufacturer, model, material, impeller or replacement dimensions.
Original illustrative symbols. Confirm the forms used in your project before interpreting a real drawing.
A pump tag is a reference, not a model.
Use it to locate the equipment list, datasheet and related drawings. The number may encode an area, system or sequence; check the project rules before decoding it.
A/B suffixes may distinguish related units. They do not, by themselves, establish duty/standby operation. Confirm the arrangement in the drawing notes or control documents.
Equipment and instruments use different identifiers. P-2101A identifies equipment here. PI-201 identifies a pressure indication function; it is not another pump.
For a vertical sump installation, collect the drawing-defined setting and interfaces using the 3171 replacement data checklist. A generic vertical symbol does not establish a 3171 model.
Trace both sides of the pump.
Follow the piping connections and flow arrows. The suction side is not always on the left of the page, and the discharge side is not always on the right. Follow off-page references to complete the system picture.
From the source to the suction nozzle
In the example, TK-101 feeds HV-101, ST-101 and pump P-101A. PI-201 is a suction-side pressure indication point.
- Identify the source vessel, header and relevant liquid levels.
- Record isolation and strainer arrangements where shown.
- Find pressure taps and cross-sheet connections.
- Use dimensions, levels and loss data to review suction conditions.
From the discharge nozzle to the process
The example shows PI-203, total-flow measurement, a recycle branch, NRV-101 and HV-102 before the process header.
- Confirm the check valve’s permitted direction.
- Locate isolation and control functions.
- Identify where measured flow splits into process and recycle flow.
- Trace the downstream destination and auxiliary branches.
Identify the valve function before its exact type.
| Tag in this example | Function | What the drawing does not establish |
|---|---|---|
| HV-101 / HV-102 | Manually operated isolation | The generic symbol does not establish ball, gate or globe construction, pressure rating or normal position. |
| NRV-101 | Non-return / check valve | Confirm the allowed direction and actual valve type. A check valve is not a positive isolation device. |
| FV-202 | Controlled recycle valve | Confirm actuator, fail position, valve capacity and control action from the valve and control documents. |
| ST-101 | Strainer in this project’s legend | Confirm element specification and clean/dirty pressure loss. A strainer is not a valve. |
Line identifiers may include pipe size, service, sequence and piping class. Read each field against the project’s line-numbering rules and line list; the code is not universal. Normal-open/normal-closed notes describe a stated condition, while fail-open/fail-closed notes describe a specified failure response.
Read the instrument letters in context.
| Tag in this example | Meaning | What to confirm |
|---|---|---|
| PI-201 / PI-203 | Pressure indicator | Tap location, pressure basis and actual reading |
| FT-202 | Flow transmitter | It measures total pump flow before the split here. |
| FIC-202 | Flow indicating controller | Control action and setpoint in the control documents |
| FV-202 | Flow control valve | Recycle service, sizing and actual valve specification |
For these instrument tags, the first letter identifies the measured variable and succeeding letters identify functions. A control signal line is not a fluid pipe. Alarm or switch symbols alone do not describe the complete shutdown logic.
Separate valve state, control, alarm and shutdown.
Read the condition attached to each valve state.
| Marking | Condition described | Review question |
|---|---|---|
| NO / NC | Normally open / normally closed in the stated operating condition. | Which mode is normal: running, standby or shutdown? |
| FO / FC / FIS | Fail open / fail closed / fail in situ (hold position), for the defined failure. | Is the failure loss of air, electrical power, control signal or a combination? |
| LO / LC | Locked open / locked closed. | Which approved isolation and operating procedure governs the lock? |
| CSO / CSC | Car-sealed open / car-sealed closed. | What seal-control procedure applies, and how is position verified? |
A valve can be normally open and fail closed: the labels describe different conditions. Confirm the actuator, solenoid and energy sources with the valve datasheet and control documents. Selection of the required failure response belongs to the process hazard and control review.
Follow the complete functional chain.
In the original diagram above, FT-202 → FIC-202 → FV-202 describes measurement, control and the final element for recycle. A normal regulating loop can change valve position continuously. An alarm calls for an operator response; a trip commands the action defined in the cause-and-effect matrix.
| Function | Record from the approved package |
|---|---|
| Normal control | Measured variable, tap location, signal type, controller action, setpoint and final element. |
| Alarm | Initiating tag, threshold, units, delay/deadband where specified and required operator response. |
| Permissive or trip | Initiating condition, logic reference, commanded equipment action, valve response, latching/reset and restart requirements. |
For a low-suction-pressure trip, for example, identify the actual pressure device, logic and motor-stop output in the approved documents. Include any associated valve commands. A switch symbol alone does not establish the complete shutdown sequence or a SIL rating. Field checks and functional testing follow the approved plant procedure.
Find the minimum-flow path.
A centrifugal pump may need recycle flow when the process demand falls below its permitted operating flow. Trace the branch from the discharge side to its destination, then identify how its flow is limited or controlled.
Flow balance at the process/recycle split
Q identifies volumetric flow. This simplified steady-state example assumes a constant-density liquid and no other branches or accumulation. FT-202 is before the split and measures total pump flow. The values illustrate the balance; the approved minimum-flow requirement comes from the pump manufacturer.
Continuous bypass
A return path remains available through a restriction. Actual recycle flow depends on pressure difference and the restriction characteristics.
Look for: branch + restriction + destinationControlled recycle
A measurement and control loop adjusts the return valve. In a total-flow control arrangement like this example, the recycle valve opens further as measured pump flow falls below the control target. Confirm the measurement location, setpoint and control action for the actual system.
Look for: flow measurement + loop + valveAutomatic recirculation valve
A self-operated device can combine a main-line non-return function with controlled bypass flow. Confirm the actual manufacturer’s arrangement.
Look for: device tag + main outlet + bypassDo not confuse recycle with seal flush.
A pipe leaving the discharge is not automatically a minimum-flow line. For example, API Plan 11 routes discharge liquid through an orifice to the seal chamber for cooling and lubrication. Other small lines may be vents, drains, cooling services or relief connections. Trace both endpoints and check the vendor drawings.
The return to TK-101 is one teaching arrangement. Its sizing, heat rejection and pressure losses need application review; a short discharge-to-suction loop is not a universal solution.
Review the seal, utilities, vents and drains.
Trace every auxiliary line to both endpoints and record the interface owner. A complete replacement review includes the seal chamber and support system as well as the main suction and discharge nozzles.
| Circuit or connection | What to record | Supporting document |
|---|---|---|
| Process-side seal flush | Source and destination, restriction, filter/cooler if fitted, direction and required conditions. | Seal drawing, connection schedule and specified piping plan. |
| Dual-seal buffer/barrier circuit | Fluid, reservoir, pressure relationship, circulation method, level/pressure/temperature monitoring. | Seal and support-system datasheets and vendor P&ID. |
| Cooling water or other cooling utility | Supply/return, available pressure and temperature, required flow and heat-removal duty. | Utility schedule and cooler data. |
| Bearing lubrication | Oil or grease arrangement, supply/return if applicable, cooler and monitoring. | Pump IOM and lubrication documentation. |
| Vent, drain and collection | Destination, pressure boundary, closed/open drain identification and isolation points. | P&ID, line list and approved maintenance/isolation procedure. |
A reservoir and cooler are clues to a support system; confirm the API plan and seal arrangement from the vendor package. John Crane’s reservoir-system information illustrates why circulation and cooling configurations must be checked against the selected system. For line opening or maintenance, establish isolation, depressurization and drainage through the approved site procedure.
Keep differential pressure separate from design pressure.
Differential pressure describes the pressure rise between specified suction and discharge reference points. Design pressure is part of the specified pressure boundary. Record operating pressure, differential pressure, design pressure and test pressure in separate fields, with gauge or absolute basis where relevant.
For a steady, incompressible liquid, pump total head between suction and discharge nozzle reference sections includes pressure, velocity and elevation terms:
Pump total head between nozzle reference sections
H is head in m; p is static pressure in Pa on a consistent reference basis; ρ is liquid density in kg/m³ at the stated condition; g is gravitational acceleration in m/s²; v is mean velocity in m/s; z is elevation in m. Subscripts d and s identify discharge and suction reference sections. Remote pressure taps require correction for intervening losses and elevations.
Worked example with explicit liquid density
Use a fictional liquid with density 900 kg/m³ and a nozzle differential pressure of 2.5 bar. Assume negligible velocity-head and elevation differences between the reference sections.
Pressure-to-head conversion for this example
Δp is 250,000 Pa, converted from 2.5 bar; ρ is 900 kg/m³; g is 9.81 m/s². The result is metres of the stated liquid. This is an original calculation example, not a duty or rating for the pump in the diagram.
Use the full head expression when velocity or elevation terms matter. Actual duty also needs flow, speed, liquid conditions and the pump curve. KSB’s head reference explains the energy basis of pump head.
Turn the drawing into a replacement brief.
Record what the drawing establishes and what still needs confirmation. Keep design pressure separate from operating pressure or pump differential head. Pipe size alone does not establish flow, and a matching flow/head point does not establish physical interchangeability.
| Information to collect | Start with the P&ID | Confirm with |
|---|---|---|
| Pump identity | Tag, service and equipment notes | Nameplate, equipment list, datasheet |
| Operating duty | Any stated flow or pressure data | Normal/minimum/maximum flow, head, curve and field data |
| Liquid conditions | Service and line identification | Fluid, concentration, temperature, density, viscosity and solids |
| Suction conditions | Source, piping and measurement points | Levels, elevations, absolute pressure, losses and NPSHA |
| Minimum-flow protection | Branch, return destination and controls | Pump limits, valve data and control description |
| Installed interfaces | Nozzle and connection clues | GA, flange details, nozzle orientation and mounting dimensions |
| Wetted materials and seals | Any material or seal notes | Casing/impeller materials, elastomers, seal faces, seal arrangement and liquid compatibility |
| Driver and sealing | Driver symbols and auxiliary systems | Motor nameplate, speed, seal datasheet and vendor drawing |
| Supply scope | Which equipment is being replaced | Complete pump or bare pump; items included or reused |
Use the pump curve reading guide to interpret hydraulic data, the frame and fitment guide for installed configuration, and the chemical resistance guide for preliminary material review.
Close the drawing review before replacement or startup.
Use one review register with columns for finding, document/revision, equipment or line tag, owner and closeout evidence. Mark a missing value as “to be confirmed” and assign it to the responsible discipline.
- Document identity: equipment tag, current revision, issue status, project legend and cross-sheet destinations agree.
- Main route: source, isolation, strainer, pump, check valve, discharge destination and parallel-pump connections are identified.
- Line specification: nominal size, applicable dimension standard, wall thickness, material, piping class, flange facing and rating are checked against the line list and specification.
- Protection and control: measurement location, recycle capacity and return destination, failure responses and logic references are documented.
- Auxiliaries: seal, cooling, lubrication, vents and drains have defined interfaces and service conditions.
- Duty and fit: datasheet, curve, GA, materials, seal chamber, driver and supply scope agree with the replacement request.
- Release: open items are resolved or formally dispositioned by the responsible discipline before the relevant procurement, installation or startup release.
Nominal pipe size is a designation. Check actual outside diameter, wall thickness and resulting bore against the applicable dimension table; a schedule number alone is insufficient to determine allowable working pressure. The ASME B36.10M overview describes the dimensional scope.
Carry the closed review items into the RFQ and commissioning checklist, including the approved startup checks for the selected pump and system.
Have a P&ID or a pump tag?
Start with what you have.
You do not need to know the exact replacement model. Send the pump tag, P&ID, nameplate or datasheet and the known duty information.
Request a Replacement Pump Review
Open the engineering RFQ, paste your brief into Material / Seal / Notes, and upload the available equipment documents. Missing details can be identified during review.
Pump P&ID review: common questions
Can a pump tag alone identify the replacement model?
A tag such as P-2101A identifies equipment under the project’s rules. Use it to locate the nameplate, equipment list and datasheet. Final replacement selection also needs duty, materials, seal arrangement and dimensional interfaces.
Does NO mean the valve fails open?
NO describes a normally open valve in the stated operating condition. FO describes the required open position under a specified failure. Confirm the failure case and actuator response in the valve and control documents.
Does a P&ID show the complete pump shutdown logic?
The P&ID identifies relevant instruments and control connections. The control narrative, cause-and-effect matrix and logic documents define initiating conditions, delays, outputs, reset and restart requirements.
Can design pressure be used to calculate pump head?
Use the pressure difference between defined suction and discharge reference points, liquid density, velocity and elevation terms to determine pump head. Design pressure is a separate pressure-boundary parameter.
Is every discharge branch a minimum-flow line?
Trace the destination and function of the branch. Minimum-flow recycle, seal flush, cooling, venting and drainage serve different purposes. Confirm the recycle requirement with the selected pump’s manufacturer data and control package.
Can a reservoir and cooler identify an API seal plan?
Confirm the seal arrangement and piping plan in the seal vendor’s datasheet and P&ID. Reservoirs and coolers can be used in different support-system configurations, with different pressure and circulation requirements.
Technical sources
This guide uses original illustrations and a fictional system example. Read it alongside your project’s legend, applicable specifications and equipment documents.
- ISA — Instrumentation and control symbols and identification
- ISO 10628-2 — Graphical symbols for chemical and petrochemical diagrams
- KSB — Centrifugal Pump Lexicon: Bypass
- SCHROEDAHL — Engineering Letter: Pump Protection
- Hydraulic Institute — Pump curves and operating regions
- John Crane — API Plan 11: Flush from discharge
- ISO 10628-1 — Diagram classification, content and representation
- ASME B36.10M — Pipe dimensions
- KSB — Pump head
- John Crane — Reservoir-based seal support systems
From the drawing to the installed pump.
Keep the P&ID, duty data and dimensional information together for the replacement review.